+86-22-65815991
Seamless steel Tube For High Temperature video

Seamless steel Tube For High Temperature

Our company has rich experience to supply seamless steel tube for customers. The application of seamless steel pipes includes high temperature service, high pressure service, transport oil, gas, water and other fluid.

Description


seamless steel tube for high temperature


Supply standard of seamless steel tube

ASTM A106, A53, A335, A192, A213, A210, A179, A519, A500, A556

API 5L, API 5CT

JIS G3452, 3454, 3456, 3445, 3466

DIN 2448, 1629, 2391, 17175

EN10025, 10210, 10255

BS1387

GB/T 8163, 8162, 5310, 3087, 3091


Supply dimension range of seamless steel tube

Nominal size: 1/8"-36"

Wall thickness: sch10-schxxs

Length: SRL, DRL, or as per customers' request

Tolerance: as per standard


Supply surface coating of seamless steel tube

It is based on customers' request. There are some surface coating in supply.

(1) Bare: no painting.

(2) Varnish painting: Transparent, a normal anti-rust.

(3) Black painting: black painting covered on original surface, make the surface of the steel pipe more beautiful, a normal anti-rust.

(4) Hot dipped galvanized: silver white. According to different request, the galvanizing thickness is different. It can play a role in antiseptic.

(5) 3LPE, 3PP, FBE: Anti-corrosion coating, insulation.

(6) Zinc phosphate primer, Epoxy zinc yellow primer, Epoxy zinc-rich primer, others as per customers' request.


Supply MOQ of seamless steel tube

For trial order, customers can order even 1pc or 2pcs to test our quality.

From future orders, MOQ is 10 tons.


Supply packing way of seamless steel tube

(1) 1"-8" seamless steel tubes: in bundles by steel strip

(2) 8" and more: Each pipe had 2PCS of cotton ropes wrapped around at pipe ends for protection

(3) All pipes both ends are capped by plastic cap or end protectors

(4) Other packing ways can be arranged as per customers' request.

packing.jpg



Supply Delivery time of seamless steel tube

Stock pipe: in 7~10 days.

No stock pipes: depending on the quantity in 30 days.


Hot Tags: Seamless steel Tube For High Temperature China, manufacturers, suppliers, factory, high quality, buy

Send Inquiry

(0/10)

clearall